Main Menu -> SALTS -> Pacific Swift 1991-93 Offshore -> Pacific Swift 1991-1993 Leg 1
Pacific Swift 1991-1993 Leg 1
Victoria to Puerto Vallarta.
Please note, since positions were relayed via a HAM radio network there are many days during this voyage for which no position is available, either from the HAM reports received by the office, or from copies of the Swiftīs log.
Please note, since positions were relayed via a HAM radio network there are many days during this voyage for which no position is available, either from the HAM reports received by the office, or from copies of the Swiftīs log.
Total Distance:
2694.85nm over 58.96 days
Average distance each day: 45.71nm
Distance from last position : 0.00nm
Average distance each day: 45.71nm
Distance from last position : 0.00nm
Last Position: 20°38'11.04 N 105°14'16.80 W on November 12th 1991 @ 13:00 |
Heading 150°
Ship's Log:
Tyler Brand & Heather Chapman married aboard "Pacific Swift"
Readings:
Pressure | |
Wind | |
Temp |